Development Timeline
Development Timeline
2013: Started machining, injection molding, and mold business in Dongguan.
2015: Entered the development and production of automated operating systems equipment for testing electric vehicle parts
2018: Became a supplier of spare parts for semiconductor companies.
2021: Developed the design and machining of parts made from super-hard metals (such as tungsten, molybdenum, nickel) and various hard alloys.
2023: Built 20,000 square meters self-owned factory in Ningbo and further expanded the automatic electric vehicle testing equipment production.
2013: Started machining, injection molding, and mold business in Dongguan.
2015: Entered the development and production of automated operating systems equipment for testing electric vehicle parts
2018: Became a supplier of spare parts for semiconductor companies.
2021: Developed the design and machining of parts made from super-hard metals (such as tungsten, molybdenum, nickel) and various hard alloys.
2023: Built 20,000 square meters self-owned factory in Ningbo and further expanded the automatic electric vehicle testing equipment production.